| 2026-08-11 |
BE-202605548 |
Electrical |
Upgrade and installation of fixtures, receptacles, and switches. |
— |
| 2026-08-11 |
BM-202603802 |
HVAC |
DUCTWORK |
— |
| 2026-08-11 |
BM-202603801 |
HVAC |
DUCTWORK |
— |
| 2026-08-11 |
BM-202603800 |
HVAC |
DUCTWORK |
— |
| 2026-08-11 |
BE-202605549 |
Electrical |
Upgrade and installation of fixtures, receptacles and switches. |
— |
| 2026-08-11 |
BM-202603803 |
HVAC |
DUCTWORK |
— |
| 2026-08-11 |
BE-202605546 |
Electrical |
Upgrade and installation of fixtures, receptacles and switches. |
— |
| 2026-08-11 |
BE-202605547 |
Electrical |
Upgrade and installation of fixtures, receptacles and switches. |
— |
| 2026-07-14 |
BP-202602813 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM PER NFPA 13 2022. |
— |
| 2026-07-14 |
BP-202602810 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM PER NFPA 13 2022. |
— |
| 2026-07-14 |
BP-202602812 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM PER NFPA 13 2022. |
— |
| 2026-07-14 |
BP-202602811 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM PER NFPA 13 2022. |
— |
| 2026-07-08 |
BE-202604689 |
Electrical |
Electrical installation / branch circuits |
— |
| 2026-06-11 |
BS-202600490 |
Sign |
Install wall sign N04 left side of building |
— |
| 2026-06-11 |
BS-202600488 |
Sign |
install Flemmings projecting sign |
— |
| 2026-06-11 |
BS-202600487 |
Sign |
install N04 wall sign rear of building |
— |
| 2026-06-11 |
BS-202600489 |
Sign |
Install logo wall sign |
— |
| 2026-06-11 |
BS-202600486 |
Sign |
install hanging sign N05 |
— |
| 2026-06-09 |
BS-202600473 |
Sign |
Install Flemmings Prime Steakhouse & Wine Bar wall sign |
— |
| 2026-06-04 |
BB-202604918 |
Plumbing |
Application 4 of 4 First generation build-out in a vacant suite within a multi-story office building. The Buil |
— |
| 2026-06-04 |
BB-202604917 |
Plumbing |
Application 3 of 4 First generation build-out in a vacant suite within a multi-story office building. The Buil |
— |
| 2026-06-04 |
BB-202604915 |
Plumbing |
Application 2 of 4First generation build-out in a vacant suite within a multi-story office building. The Build |
— |
| 2026-06-04 |
BB-202604914 |
Plumbing |
Application 1 of 4First generation build-out in a vacant suite within a multi-story office building. The Build |
— |
| 2026-06-01 |
BE-202603738 |
Electrical |
From switchboard MSS 1 pull one set of 4-600 KCMIL and 1-750 KCMIL ground, XHHW AL, into 4 inch spare conduit, |
— |
| 2026-04-29 |
BP-202601752 |
Plumbing |
Including, but not limited to, the installation of new plumbing fixtures. |
— |
| 2026-04-29 |
BB-202603839 |
Commercial fit-out |
PROJECT SCOPE IS TO RENOVATE A PORTION OF 1 FLOOR FOR AN EXISTING CLIENT.SCOPE OF WORK IS FOR FLOOR 26 AND WIL |
— |
| 2026-04-20 |
BP-202601596 |
Plumbing |
ALTERATION TO EXISTING PLUMBING ON ENTRY TO THE RESTAURANT. TRENCH DRAIN RELOCATION / REPLACEMENT. FLOOR DRAIN |
— |
| 2026-03-26 |
BE-202602073 |
Low voltage |
Install Audio System |
— |
| 2026-03-26 |
BM-202601374 |
HVAC |
Installing 3 owner-supplied grease hoods. |
— |
| 2026-03-19 |
BE-202601867 |
Low voltage |
New surveillance system |
— |
| 2026-03-12 |
BM-202601135 |
HVAC |
A1 Restaurant Building - Build out of an existing cold dark Shell to become a Fleming's Prime. Gas Pipe distri |
— |
| 2026-03-05 |
BE-202601449 |
Low voltage |
MODIFICATION TO FIRE ALARM SYSTEM FOR RENOVATION. |
— |