| 2026-07-23 |
BE-202605017 |
Low voltage |
2 ceiling strobes |
— |
| 2026-07-07 |
BE-202604629 |
Low voltage |
Low Voltage Installation of 20 Cat6 data cables and 4 Speakers |
— |
| 2026-07-07 |
BE-202604628 |
Low voltage |
- The project consists of adding Nurse Call within the Emory University Hospital Patient Tower on the first-fl |
— |
| 2026-07-01 |
BE-202604575 |
Electrical |
Interior renovation to an existing space |
— |
| 2026-06-25 |
BM-202602907 |
HVAC |
Renovating the CT-2 Tower at Emory University Hospital. Rerouting duct, installing two new VAVs, installing ne |
— |
| 2026-06-25 |
BP-202602590 |
Plumbing |
Renovating the CT-2 Tower at Emory University Hospital. Installing plumbing fixtures which include: one toilet |
— |
| 2026-06-22 |
BP-202602505 |
Addition |
Advantage Fire to add and relocate sprinkler heads off the existing system per NFPA13 2022 |
— |
| 2026-05-28 |
BP-202602156 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM PER NFPA 13. |
— |
| 2026-05-18 |
BM-202602196 |
HVAC |
Demo and existing fan coil and replace with a new Diakin fan coil as required. Install chilled water lines fro |
— |
| 2026-05-15 |
BP-202601972 |
Plumbing |
THIS PROJECT CONSISTS OF AN INTERIOR RENOVATION WITHINAN EXISTING BUSINESS OCCUPANCY 643 SF SUITE CLINIC A BUI |
— |
| 2026-05-14 |
BE-202603317 |
Electrical |
Interior renovation within an existing business occupancy 643 SF suite clinic a building. |
— |
| 2026-04-10 |
BB-202603185 |
Remodel |
The project consists of a 1,270 S.F. renovation within the Emory University Hospital Patient Tower on the firs |
— |
| 2026-03-20 |
BB-202602492 |
HVAC |
THIS PROJECT CONSISTS OF AN INTERIOR RENOVATION WITHIN AN EXISTING BUSINESS OCCUPANCY 643 SF SUITE CLINIC A BU |
— |