| 2026-06-30 |
BE-202604530 |
Low voltage |
Demo a portion of the 37th floor and then install New Fire Alarm Panels/Devices, while tying to the existing ( |
— |
| 2026-06-30 |
BP-202602645 |
Addition |
ADVANTAGE FIRE IS TO ADD/RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM IN ACCORDANCE TO NFPA 13 2022. |
— |
| 2026-06-26 |
BE-202604447 |
Low voltage |
Demo a portion of the 37th floor and then installing new fire alarm panel/devices, while tying them to the exi |
— |
| 2026-06-08 |
BP-202602309 |
Remodel |
Fire sprinkler remodel for Woodruff Peachtree Atlanta, Suite 3700.GC MASTER PERMIT: BB-202603279 |
— |
| 2026-06-08 |
BP-202602311 |
Remodel |
Fire sprinkler remodel for 191 Peachtree 37th Floor Common Area, Suite 3700.GC MASTER PERMIT: BB-202602972 |
— |
| 2026-06-05 |
BP-202602290 |
Plumbing |
Including, but not limited to installation of new plumbing and fixtures. |
— |
| 2026-06-05 |
BP-202602291 |
Plumbing |
Including, but not limited to installation of new plumbing and fixtures. |
— |
| 2026-06-05 |
BM-202602517 |
HVAC |
Including, but not limited to duct alterations and installation of new terminal units and air distribution. |
— |
| 2026-06-05 |
BM-202602511 |
HVAC |
Including, but not limited to duct alterations and installation of new terminal units and air distribution. |
— |
| 2026-06-04 |
BP-202602269 |
Plumbing |
Install of 2 sinks |
— |
| 2026-05-18 |
BE-202603372 |
Electrical |
Electrical Alteration to Suite 3700 |
— |
| 2026-05-18 |
BE-202603370 |
Electrical |
Electrical Renovation of Exiting Common Area on 37th Floor |
— |
| 2026-05-15 |
BE-202603362 |
Low voltage |
LOW VOLTAGE CABLE INSTALLATION |
— |
| 2026-05-08 |
BE-202603163 |
Low voltage |
replace existing 7 Door Access Control System and replace 3 Cameras. |
— |
| 2026-04-20 |
BE-202602625 |
Low voltage |
Low Voltage Cable Installation |
— |
| 2026-04-14 |
BB-202603279 |
HVAC |
Scope of work includes installation of new partitions, ceiling systems, and lighting; new interior finishes (c |
— |
| 2026-04-03 |
BB-202602972 |
Plumbing |
Renovation to existing Elevator Lobby and Restrooms on 37th Floor in a multi-story office building. The projec |
— |
| 2026-03-16 |
BB-202602321 |
Demolition |
*Interior Demo Only Permit*THIS PROJECT IS THE DEMOLITION OF A PORTION OF AN EXISTING, UNOCCUPIED TENANT SPACE |
— |