| 2026-08-27 |
BE-202606025 |
Low voltage |
MODIFICATION TO FIRE ALARM SYSTEM FOR RENOVATION. |
— |
| 2026-08-25 |
BE-202605910 |
Low voltage |
Alteration of existing Fire Alarm System. Renovating existing shell space into patient unit fit out of 4th flo |
— |
| 2026-08-25 |
BE-202605913 |
Low voltage |
Alteration of the existing fire alarm system. Renovating the 10th floor of the Marcus Tower to patient fit out |
— |
| 2026-08-25 |
BE-202605911 |
Low voltage |
Alteration of the existing Fire Alarm System. Renovating part of the 5th floor of the Marcus Tower for patient |
— |
| 2026-08-25 |
BE-202605915 |
Low voltage |
Renovation of Fire Alarm system in existing Future Use/Tenant spaces for fit out of Preparation/Post work spac |
— |
| 2026-08-20 |
BB-202607319 |
Remodel |
INTERIOR MODIFICATION OF EXISTING RESPIRATORY THERAPY OFFICE SUITE FOR NEW PHARMACY CONFERENCE ROOM AND OFFICE |
— |
| 2026-08-06 |
BM-202603722 |
HVAC |
Mechanical scope for the replacement of a LINAC unit. This involves installation of a new FCU, a Heat Exchange |
— |
| 2026-08-05 |
BE-202605391 |
Low voltage |
Installation of data cabling for remodel |
— |
| 2026-08-05 |
BE-202605390 |
Electrical |
Installation of data cabling for remodel |
— |
| 2026-07-23 |
BP-202602943 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER PER NFPA 13 2022. |
— |
| 2026-07-23 |
BP-202602932 |
Addition |
CFP is to add and relocate sprinklers off of existing wet system to meet NFPA 13 requirements |
— |
| 2026-07-22 |
BP-202602927 |
Addition |
ADVANTAGE FIRE IS TO ADD/RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM IN ACCORDANCE TO NFPA 13 2022 |
— |
| 2026-07-22 |
BE-202604974 |
Low voltage |
Low-Voltage Data Cabling |
— |
| 2026-07-20 |
BM-202603343 |
HVAC |
Interior mechanical renovation of the 5th floor of Piedmont Hospital's transplant institute. Addition of 12 re |
— |
| 2026-07-20 |
BM-202603345 |
HVAC |
INTERIOR MODIFICATION OF EXISTING TENANT SUITE FOR NEW RESPIRATORY THERAPY STAFF OFFICES, CONFERENCE ROOM, BRE |
— |
| 2026-07-16 |
BP-202602869 |
Addition |
add and relocate; 152 total heads; BB-202601760 |
— |
| 2026-07-16 |
BM-202603294 |
HVAC |
Renovation of an existing space into 2 operating rooms and a supporting sterile storage space. As BKI Mechanic |
— |
| 2026-07-15 |
BP-202602837 |
Plumbing |
Patient Unit Fit Out on Level 4 |
— |
| 2026-07-15 |
BP-202602838 |
Plumbing |
Patient Unit Fit Out on Level 5 |
— |
| 2026-07-15 |
BP-202602840 |
Plumbing |
Patient Fit Out on Level 10 |
— |
| 2026-07-02 |
BP-202602670 |
Addition |
ADVANTAGE FIRE IS TO ADD/RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM IN ACCORDANCE TO NFPA 13 2022. |
— |
| 2026-07-01 |
BP-202602662 |
Demolition |
DEMO SYSTEM AFTER FLOOR CONTROL VALVE AND INSTALL NEW MAIN, BRANCHLINES AND SPRINKLERS THROUGHOUT THE 10TH FLO |
— |
| 2026-06-29 |
BE-202604491 |
Low voltage |
I1 Hospital Building - Building/Commercial/Alteration/NA - RENOVATION OF EXISTING STORAGE SPACES ON THE FIRST |
— |
| 2026-06-25 |
BE-202604399 |
Electrical |
Renovating existing office and storage space to serve as two ORs and one Perfusion room. |
— |
| 2026-06-16 |
BP-202602438 |
Demolition |
DEMO EXISTING SPRINKLER SYSTEM AFTER FLOOR CONTROL VALVE AND INSTALL NEW MAINS. BRANCHLINES AND SPRINKLERS THR |
— |
| 2026-06-02 |
BM-202602431 |
HVAC |
Patient Unit Fit Out on Level 4 of the Piedmont Atlanta Hospital Marcus Tower |
— |
| 2026-06-02 |
BM-202602444 |
HVAC |
Patient Unit Fit Out on Level 10 of Piedmont Atlanta Hospital Marcus Tower |
— |
| 2026-06-02 |
BM-202602430 |
HVAC |
VAV installations for patient rooms along with the associated duct distribution and hot water reheat piping. P |
— |
| 2026-05-20 |
BM-202602251 |
HVAC |
MECHANICAL AHU FIT-OUT ON LEVEL 03....Floor 3 is a mechanical layer where a new AHU will be installed to serve |
— |
| 2026-05-20 |
BM-202602227 |
HVAC |
Duct rework off of existing terminal units as well as (1) new terminal unit installation |
— |
| 2026-05-18 |
BE-202603391 |
Electrical |
Renovation of existing storage space on the first floor of the building into Pre/Post bays and supporting room |
— |
| 2026-05-14 |
BM-202602161 |
HVAC |
Installing HVAC(6) VAV's with HW coils |
— |
| 2026-05-11 |
BE-202603197 |
HVAC |
Providing electrical connections to new Mechanical unit on the 3rd Floor of the Marcus Tower (1 Building). |
— |
| 2026-05-11 |
BE-202603203 |
Electrical |
Complete electrical buildout of the remaining shell space on the 5th floor of the Marcus Tower (1 Building). |
— |
| 2026-05-11 |
BE-202603198 |
Electrical |
Providing complete electrical install on a shell floor in the Marcus Tower (1 Building). |
— |
| 2026-05-11 |
BE-202603205 |
Electrical |
Complete electrical buildout of the 10th floor shell space in the Marcus Tower (1 Building). Adding 5 feeders |
— |
| 2026-05-07 |
BE-202603130 |
Low voltage |
(7) SPSCWL Speaker Strobe: White: Ceiling Mount: Marked FIRE(9) SCWLED Ceiling Mount Strobe with LED, FIRE Lab |
— |
| 2026-05-07 |
BE-202603132 |
Low voltage |
(1) SPSCWL Speaker Strobe: White: Ceiling Mount: Marked FIRE(1) SCWLED Ceiling Mount Strobe with LED, FIRE Lab |
— |
| 2026-05-06 |
BE-202603087 |
Low voltage |
PROJECT INCLUDES INSTALLATION, PROGRAMMING, AND TESTING OF STRUCTURED CABLING, ACCESSCONTROL, SECURITY/CCTV, E |
— |
| 2026-05-06 |
BE-202603088 |
Low voltage |
PROJECT INCLUDES INSTALLATION, PROGRAMMING, AND TESTING OF STRUCTURED CABLING, ACCESSCONTROL, SECURITY/CCTV, E |
— |