| 2026-08-27 |
BE-202606008 |
Low voltage |
INSTALL ONE SPEAKER/STROBE AND TWO STROBE ONLY DEVICES IN TENANT EXPANSION AREA. |
— |
| 2026-08-27 |
BE-202606010 |
Low voltage |
INSTALL TWO MANUAL PULL STATIONS AND RELOCATE FOUR SPEAKER/STROBES PER NEW TENANT FLOOR PLAN LAYOUT |
— |
| 2026-08-26 |
BE-202605990 |
Electrical |
Interior fit out of tenant office suite including new & reused lighting and additional misc branch power |
— |
| 2026-08-25 |
BM-202604111 |
HVAC |
Duct modification. Add thermostat. Test and balance. |
— |
| 2026-08-25 |
BE-202605918 |
Electrical |
Interior fit out of tenant office suite including new & reused lighting and additional misc branch power |
— |
| 2026-08-21 |
BP-202603334 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM PER NFPA 13. |
— |
| 2026-08-13 |
BE-202605597 |
Electrical |
Replace all lighting and receptacles in suite 420, add new water heater, add new PIU unit |
— |
| 2026-08-13 |
BE-202605596 |
Electrical |
Replace all lighting and receptacles in suite 410, add new water heater, add new PIU unit |
— |
| 2026-08-13 |
BE-202605598 |
Electrical |
Replace all lighting and receptacles in suite 430, Add new water heater, Add new PIU unit |
— |
| 2026-08-13 |
BE-202605595 |
Electrical |
Replace all lighting and receptacles in suite 400, add new water heater, add new PIU unit |
— |
| 2026-08-12 |
BP-202603198 |
Commercial - Fire Sprinkler |
Relocate existing Fire sprinkler System to accommodate new Wall & Ceiling Layout |
— |
| 2026-08-12 |
BP-202603197 |
Commercial - Fire Sprinkler |
Relocate Existing fire Sprinkler System to accommodate new wall & ceiling layout |
— |
| 2026-08-12 |
BP-202603199 |
Commercial - Fire Sprinkler |
Relocate Existing Fire Sprinkler System to Accommodate new Wall & Ceiling layout |
— |
| 2026-08-12 |
BP-202603200 |
Commercial - Fire Sprinkler |
Relocate Existing Fire Sprinkler System to Accommodate new Wall & Ceiling Layout |
— |
| 2026-08-12 |
BP-202603201 |
Commercial - Fire Sprinkler |
Relocate Existing Fire Sprinkler System to Accommodate New Wall & Ceiling Layout |
— |
| 2026-08-11 |
BP-202603171 |
Plumbing |
Install 1 sink, 1 dishwasher, 1 water heater |
— |
| 2026-08-11 |
BP-202603168 |
Plumbing |
Install 1 sink, 1 water heater, 1 dishwasher |
— |
| 2026-08-11 |
BM-202603813 |
HVAC |
new low pressure duct, new/relocated supply and return grills, insulation |
— |
| 2026-08-11 |
BP-202603169 |
Plumbing |
Install 1 sink, 1 water heater, 1 dishwasher |
— |
| 2026-08-11 |
BM-202603812 |
HVAC |
New low pressure duct, new/relocated supply and return grills, insulation |
— |
| 2026-08-11 |
BP-202603170 |
Plumbing |
Install 1 sink, 1 dishwasher, 1 water heater |
— |
| 2026-08-11 |
BM-202603815 |
HVAC |
New low pressure duct, new/relocated supply and return grills, insulation |
— |
| 2026-08-11 |
BM-202603816 |
HVAC |
new low pressure duct, new/relocated supply and return grills, insulation |
— |
| 2026-08-11 |
BP-202603166 |
Plumbing |
Install toilet x 6, urinals x 3, lavatories x 4 |
— |
| 2026-08-11 |
BM-202603814 |
HVAC |
New low pressure duct, new/relocated supply and return grills, insulation |
— |
| 2026-08-04 |
BB-202606775 |
Electrical |
AN EXISTING OFFICE SUITE (100 -'BUSINESS') WILL HAVE MINOR INTERIOR DEMOLITION AND RENOVATION. DEMOLITION SCOP |
— |
| 2026-07-29 |
BB-202606587 |
Remodel |
An existing office suite is expanding into a portion of an existing, vacant business suite and renovating port |
— |
| 2026-07-24 |
BE-202605084 |
Low voltage |
INSTALL 4 SPEAKER/STROBES & 2 STROBE ONLY DEVICES PER NEW S400 FLOOR PLAN LAYOUT. |
— |
| 2026-07-24 |
BE-202605085 |
Low voltage |
INSTALL 1 SMOKE DETECTOR, 1 RELAY MODULE FOR SHUTDOWN INTERFACE, 8 SPEAKER/STROBES & 3 STROBE ONLY DEVICES PER |
— |
| 2026-07-24 |
BE-202605087 |
Low voltage |
INSTALL 3 SPEAKER/STROBES & 2 STROBE ONLY DEVICES PER NEW S430 FLOOR PLAN LAYOUT. |
— |
| 2026-07-24 |
BE-202605080 |
Low voltage |
ADD 1 SMOKE, 1 POWER SUPPLY, 3 SPEAKER/STROBES & 3 STROBE ONLY DEVICES PER THE COMMON AREA FLOOR PLAN. |
— |
| 2026-07-24 |
BE-202605086 |
Low voltage |
INSTALL 2 SPEAKER/STROBES & 4 STROBE ONLY DEVICES PER NEW S420 FLOOR PLAN LAYOUT. |
— |
| 2026-07-23 |
BM-202603418 |
HVAC |
new low pressure duct, new/relocated supply and return grills, insulation |
— |
| 2026-07-23 |
BP-202602937 |
Plumbing |
waterline to Coffee |
— |
| 2026-07-23 |
BE-202605035 |
Low voltage |
Installation of low voltage cabling. |
— |
| 2026-07-16 |
BE-202604868 |
Low voltage |
RELOCATE 3 NOTIFICATION DEVICES AND ADD ONE STROBE ONLY DEVICE PER NEW TENANT FLOOR PLAN LAYOUT |
— |
| 2026-07-09 |
BE-202604716 |
Electrical |
Interior fit out of tenant office suite including new & reused lighting and additional misc branch power |
— |
| 2026-06-11 |
BP-202602360 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM PER NFPA 13. |
— |
| 2026-03-30 |
BE-202602136 |
Low voltage |
Installation of voice and data cabling including access control. |
— |
| 2026-03-11 |
BB-202602196 |
HVAC |
An existing office ('business') suite will be re-configured and renovated into a new spec suite (suite 410) on |
— |