| 2026-07-16 |
BM-202603293 |
HVAC |
Space is being built out to be used as an out source kitchen for the school while the school Demos the cafeter |
— |
| 2026-07-15 |
BE-202604838 |
Low voltage |
MODIFICATION TO FIRE ALARM SYSTEM FOR RENOVATION. |
— |
| 2026-07-09 |
BM-202603126 |
HVAC |
Remove four Trane Fan coil units, and install new Trane FCUs. Main trunk line duct to remain. New flex duct, s |
— |
| 2026-06-29 |
BP-202602636 |
Plumbing |
plumbing for temporary kitchen |
— |
| 2026-06-29 |
BE-202604509 |
Electrical |
We will be adding a Panel off an existing Switchgear and will feed all equipment needed for a temporary Kitche |
— |
| 2026-06-26 |
BE-202604463 |
Electrical |
Remodeling offices and classrooms. Installing lighting fixtures. Relocating data drops. This goes along with t |
— |
| 2026-06-26 |
BE-202604461 |
Low voltage |
Modification to fire alarm system for renovation |
— |
| 2026-06-25 |
BP-202602597 |
Addition |
relocate 31 existing 155 quick respone chrome pendant sprinkler heads and add 1 155 quick response chrome pend |
— |
| 2026-06-17 |
BE-202604211 |
Electrical |
We are remodeling some offices and classrooms. We will match and install lighting fixtures....(13) 1-30 branch |
— |
| 2026-05-01 |
BP-202601769 |
Plumbing |
Sewer Plug for The Lovett School - Phase III Riverbank Center-Demolition (COM) |
— |
| 2026-04-30 |
BB-202603880 |
Remodel |
SCOPE OF WORK INCLUDES THE PARTIAL INTERIOR RENOVATION OF AN EXISTING SCHOOL BUILDING. |
— |
| 2026-04-30 |
BB-202603878 |
Garage |
SCOPE OF WORK INCLUDES THE PARTIAL RENOVATION OF A GARAGE SPACE IN AN ADMINISTRATIVE BUILDING INTO ATEMPORARY |
— |
| 2026-03-23 |
BB-202602564 |
Addition |
THE PROPOSED PROJECT INCLUDES A RENOVATION AND 13,000 SF ADDITION TO THE EXISTING THEATER WHICH WILL INCLUDE A |
— |