| 2026-08-27 |
BM-202604188 |
HVAC |
Removing RTU and replacing with 2 AHU. upgrading controls. |
— |
| 2026-08-27 |
BM-202604189 |
HVAC |
HVAC and Controls upgrades E Concourse Phase 1. Air handler and VAV replacements |
— |
| 2026-08-04 |
BP-202603071 |
Addition |
ADD 11 RELOCATE 15 SPRINKLERS ; BB-202604224 |
— |
| 2026-06-22 |
BP-202602519 |
Commercial - Fire Sprinkler |
Advantage Fire is two install two (2) new WET systems; one at North Central PCA Room (with 24 Sprinkler heads) |
— |
| 2026-05-28 |
BM-202602344 |
HVAC |
Install new chillers, boilers, cooling towers, heat exchangers, and pumps. |
— |
| 2026-05-28 |
BM-202602345 |
HVAC |
Install of new chillers, boilers, a cooling tower, a heat exchanger, and pumps. |
— |
| 2026-05-07 |
BP-202601858 |
Commercial fit-out |
R4, A1 FOR TENANT RENOVATIONS. MASTER BLDG. PERMIT # BB-202601370. |
— |
| 2026-05-04 |
BP-202601799 |
Commercial - Fire Sprinkler |
RE-PIPING STAIRWELL SYSTEM AND RELOCATING 4 UPRIGHT SPRINKLERS TO 4 CONCEALED PENDENTS. |
— |
| 2026-04-30 |
BM-202601927 |
HVAC |
Install three mini-split HVAC systems and two overhead cassette-style indoor units, including associated refri |
— |
| 2026-04-29 |
BP-202601738 |
Remodel |
RELOCATE 18 SPRINKLERS FOR EXISTING RETAIL RENOVATION AT AIRPORT. MASTER BLDG. PERMIT # BB-202509016. |
— |
| 2026-04-23 |
BP-202601654 |
Addition |
RELOCATE 22 SPRINKLERS AND ADD 11 SPRINKLERS FOR TENANT RENOVATION AT HARSFIELD JACKSON AIRPORT CONCOURSE T. M |
— |
| 2026-04-09 |
BP-202601428 |
Commercial - Fire Sprinkler |
RELOCATE 11 SPRINKLER HEADS. MASTER BLDG. PERMIT # IS BB-202510638 |
— |
| 2026-04-09 |
BP-202601429 |
Addition |
RELOCATE 9 SPRINKLERS AND ADD 1 HEAD. MASTER BLDG. PERMIT # BB-202510636. |
— |
| 2026-04-09 |
BP-202601437 |
Commercial - Fire Sprinkler |
ADVANTAGE FIRE SPRINKLER IS TO RELOCATE FOURTEEN (14) SPRINKLER HEADS AND PLUG ONE (1) FOLLOWING THE NFPA 13, |
— |
| 2026-04-01 |
BP-202601324 |
Commercial - Fire Sprinkler |
RELOCATE 8 CONCEALED PENDENT SPRINKLERS, PLUS 5 EXISTING 1" OUTLETS. TOTAL # OF SPRINKLERS IS 8. MASTER BLDG. |
— |
| 2026-04-01 |
BP-202601323 |
Addition |
RELOCATE 10 AND ADD 3 SPRINKLERS FOR TENANT RENOVATION AT HARTSFIELD-JACKSON ATLANTA INTERNATIONAL AIRPORT. MA |
— |
| 2026-03-26 |
BP-202601230 |
Addition |
RELOCATE 6 AND ADD 2 SPRINKLER HEADS FOR TENANT RENOVATION AT THE AIRPORT. MASTER BLDG. PERMIT # IS BB-2025103 |
— |
| 2026-03-25 |
BP-202601214 |
Addition |
RELOCATE 7 AND ADD 4 SPRINKLERS FOR TENANT RENOVATION AT HARTSFIELD JACKSON AIRPORT. MASTER BLDG. PERMIT # BB- |
— |
| 2026-03-17 |
BT-202600502 |
Temporary Power |
Temp power installation for the AAC building |
— |
| 2026-03-16 |
BP-202601040 |
Addition |
ADD 2 CONCEALED PENDENTS, 2 NEW UPRIGHTS, RELOCATE 56 CONCEALED PENDENTS, RELOCATE 3 DRY PENDENTS AND 1 NEW UP |
— |
| 2026-03-12 |
BP-202600990 |
Addition |
RELOCATE 6 SPRINKLERS AND ADD 6 SPRINKLERS FOR INTERIOR KITCHEN RENO AT THE AIRPORT. MASTER BLDG. PERMIT # IS |
— |
| 2026-03-12 |
BP-202600993 |
Addition |
ADD 7 CONCEALED PENDENTS AND 1 UPRIGHT. RELOCATE 30 PENDENT SPRINKLERS AND 2 DRY PENDENT SPRINKLERS. PLUS 3 OU |
— |
| 2026-03-04 |
BE-202601426 |
Low voltage |
Installation of a complete Code compliant Fire Alarm System |
— |
| 2026-03-04 |
BE-202601427 |
Low voltage |
Installation of a complete code compliant Fire Alarm System |
— |
| 2026-03-04 |
BE-202601422 |
Low voltage |
Installation of a code compliant Fire Alarm System |
— |
| 2026-03-04 |
BE-202601424 |
Low voltage |
Installation of a complete code compliant Fire Alarm System |
— |