| 2026-05-29 |
BP-202602174 |
Remodel |
Fire sprinkler remodel for Chamberlain Hrdlicka, Suite 2000, Level 20 |
— |
| 2026-05-29 |
BP-202602173 |
Remodel |
Fire sprinkler remodel for Chamberlain Hrdlicka, Suite 1900, Level 19 |
— |
| 2026-05-28 |
BE-202603652 |
Low voltage |
Low Voltage Data Cabling |
— |
| 2026-05-28 |
BE-202603651 |
Low voltage |
Low Voltage Data Cabling |
— |
| 2026-05-26 |
BP-202602111 |
Plumbing |
Including, but not limited to installation of new plumbing and fixtures. |
— |
| 2026-05-26 |
BP-202602114 |
Plumbing |
Including, but not limited to installation of new plumbing and fixtures. |
— |
| 2026-05-26 |
BP-202602112 |
Plumbing |
Including, but not limited to installation of new plumbing and fixtures. |
— |
| 2026-05-26 |
BP-202602113 |
Plumbing |
Including, but not limited to installation of new plumbing and fixtures. |
— |
| 2026-05-26 |
BM-202602324 |
HVAC |
Including, but not limited to duct alterations and installation of new terminal units and air distribution. |
— |
| 2026-05-26 |
BM-202602322 |
HVAC |
Including, but not limited to duct alterations and installation of new terminal units and air distribution. |
— |
| 2026-05-26 |
BM-202602323 |
HVAC |
Including, but not limited to duct alterations and installation of new terminal units and air distribution. |
— |
| 2026-05-18 |
BE-202603405 |
Electrical |
Electrical Renovation to Existing Restroom on 20th Floor. |
— |
| 2026-05-18 |
BB-202604345 |
Plumbing |
Renovation to existing Restrooms on the 18th Floor in a multi-story office building. The projectscope consists |
— |
| 2026-05-18 |
BE-202603406 |
Electrical |
Electrical Renovation to Existing Common Area on 19th Floor |
— |
| 2026-05-15 |
BB-202604309 |
Demolition |
Removal of existing suite conditions in preparation for future construction scope to be covered in separate dr |
— |
| 2026-05-04 |
BE-202603017 |
Electrical |
Electrical Interior Buildout / Renovation of Suite 2000 |
— |
| 2026-05-04 |
BE-202603016 |
Electrical |
Partial Electrical Buildout of Suite 1900 |
— |
| 2026-04-28 |
BE-202602883 |
Low voltage |
44 data cables for AP’s (22 dual drops)10 Data drops for printer/work stations |
— |
| 2026-04-27 |
BB-202603744 |
HVAC |
THE SCOPE OF WORK CONSISTS OF INTERIOR RENOVATION OF APPROXIMATELY 24,000 SQUARE FEET AND THE CONSTRUCTION OF |
— |
| 2026-03-24 |
BS-202600234 |
Sign |
Replace existing wall sign with new |
— |
| 2026-03-16 |
BE-202601735 |
Low voltage |
Installation of Video conferencing system (wall mounted displays, conferencing system) in 7 rooms. Also, a sou |
— |
| 2026-03-04 |
BE-202601432 |
Electrical |
Electrical and lighting interior renovation |
— |
| 2026-03-04 |
BE-202601420 |
Low voltage |
fire alarm modifications for new tenant |
— |
| 2026-03-02 |
BP-202600813 |
Addition |
CFP is to add and relocate sprinklers off of existing wet system to meet NFPA 13 requirements |
— |