| 2026-08-26 |
BE-202605981 |
Low voltage |
Fire alarm modifications |
— |
| 2026-08-24 |
BP-202603366 |
Plumbing |
Including, but not limited to, the installation of new plumbing fixtures. |
— |
| 2026-08-24 |
BM-202604090 |
HVAC |
Including, but not limited to duct alterations and installation of new terminal units and air distribution. |
— |
| 2026-08-24 |
BE-202605880 |
Low voltage |
FIRE ALARM MODIFICATIONS |
— |
| 2026-08-19 |
BE-202605777 |
Low voltage |
Installing 2 Elevator Lobby Doors & 4 Strike Doors & 5 Cameras |
— |
| 2026-08-18 |
BP-202603286 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM PER NFPA 13. |
— |
| 2026-08-18 |
BE-202605717 |
Electrical |
Branch circuit installation |
— |
| 2026-08-17 |
BP-202603254 |
Addition |
CFP is to add and relocate sprinklers off of existing wet system to meet NFPA 13 requirements |
— |
| 2026-08-12 |
BP-202603176 |
Addition |
CFP is to add and relocate sprinklers off of existing wet system to meet NFPA 13 requirements |
— |
| 2026-08-12 |
BP-202603178 |
Addition |
CENTURY TO ADD AND RELOCATE OFF THE EXISITNG FIRE SPRINKLER SYSTEM PER NFPA 13. |
— |
| 2026-08-11 |
BE-202605537 |
Low voltage |
Low Voltage Cable Installation |
— |
| 2026-08-11 |
BE-202605552 |
Low voltage |
Low Voltage Cable Installation |
— |
| 2026-08-05 |
BP-202603087 |
Remodel |
Fire sprinkler remodel for 19th floor common area.BB-202601564 |
— |
| 2026-07-24 |
BP-202602951 |
Plumbing |
Including, but not limited to installation of new plumbing and fixtures. |
— |
| 2026-07-24 |
BM-202603431 |
HVAC |
Including, but not limited to duct alterations and installation of new terminal units and air distribution. |
— |
| 2026-07-23 |
BE-202605044 |
Low voltage |
FIRE ALARM MODIFICATIONS |
— |
| 2026-07-23 |
BE-202605045 |
Low voltage |
FIRE ALARM MODIFICATIONS |
— |
| 2026-07-23 |
BE-202605043 |
Low voltage |
FIRE ALARM MODIFICATIONS |
— |
| 2026-07-21 |
BE-202604954 |
Electrical |
Electrical and lighting interior buildout. |
— |
| 2026-07-15 |
BB-202606155 |
Remodel |
WORK INVOLVES THE PARTIAL ALTERATION OF THE FIFTEENTH FLOOR. EXISTING STAIRS AND CORERESTROOMS TO REMAIN |
— |
| 2026-07-09 |
BM-202603131 |
HVAC |
HVAC renovation of a tenant space on the 21st floor including replacement of terminal units, (1) WSHP along wi |
— |
| 2026-07-09 |
BP-202602747 |
Plumbing |
Plumbing renovation of an existing tenant space on the 21st floor consisting of replacing toilets, sinks and n |
— |
| 2026-07-09 |
BE-202604722 |
Electrical |
Electrical and lighting - interior Demo and Office Build out |
— |
| 2026-06-30 |
BB-202605700 |
Plumbing |
Second generation buildout in a vacant suite within a multi-story office building. The projectscope consists o |
— |
| 2026-06-22 |
BE-202604295 |
Low voltage |
fire alarm modifications |
— |
| 2026-06-22 |
BE-202604293 |
Low voltage |
fire alarm modifications |
— |
| 2026-06-22 |
BE-202604296 |
Low voltage |
fire alarm modifications |
— |
| 2026-06-22 |
BE-202604294 |
Low voltage |
fire alarm modifications |
— |
| 2026-06-11 |
BE-202604051 |
Electrical |
Interior fit out of restrooms including new lighting and additional misc branch power |
— |
| 2026-06-11 |
BP-202602373 |
Plumbing |
install of 6 lavatories, 6 water closets, 2 urinals, and 1 drinking fountain |
— |